Most migration pain is decided before the first workload moves. Assessment quality, landing zone design and wave planning determine whether the programme compounds momentum or accumulates exceptions — here we cover the whole path from business case to steady-state operations.

  • 1 published resource
  • Updated November 2026
  • Assessment
  • The 7 Rs
  • Landing zones
  • Wave planning
  • Application rationalisation
  • Exit strategy

A cloud migration is a programme, not a project. It touches architecture, security, finance and operations at once, and it runs long enough for assumptions to expire mid-flight. The teams that get through it cleanly share a pattern: they invest heavily in assessment, they build a landing zone that encodes their guardrails, and they migrate in waves that each produce a working, decommissioned-on-the-other-side result.

The migration lifecycle

  1. 01

    Assess

    Inventory workloads, dependencies and constraints. Classify every application against the 7 Rs and estimate migration and run costs honestly.

  2. 02

    Mobilise

    Build the landing zone: identity, networking, security guardrails, logging, and the account or subscription structure that keeps everything governable.

  3. 03

    Migrate & modernise

    Move in waves sized to your team's capacity. Prefer rehost where speed matters, replatform where managed services remove real operational load.

  4. 04

    Operate & optimise

    Hand over to steady-state operations with cost visibility, SLOs and a decommissioning plan for the old estate.

What this section covers

  • Migration assessment and application rationalisation techniques that survive contact with reality
  • The 7 Rs explained with decision criteria, not definitions
  • Landing zone design: identity, network topology, guardrails and governance
  • Wave planning, cutover risk and rollback strategy
  • Total cost of migration: the bills that appear after the business case is signed

Featured resources

Featured reading

Start with this topic area's key resources, then the guides our readers return to most across CloudSolution.

All guides

Cloud Migration & Strategy

Cloud Migration Strategy: From Assessment to Steady State

A complete cloud migration strategy guide: assessment, the 7 Rs applied, landing zones, wave planning, cutover risk and the costs that appear after the business case is signed.

9 min readUpdated November 19, 2026

Cost Optimization (FinOps)

Cloud Cost Optimization: A Practical FinOps Playbook

A practical FinOps playbook for cloud cost optimization: allocation, rightsizing, commitments, storage hygiene, unit economics and the operating cadence that keeps savings.

9 min readUpdated November 17, 2026

Key topics

What we cover under cloud migration & strategy

The 7 Rs, applied

Rehost, replatform, repurchase, refactor, retire, retain, relocate — with real decision tests.

Landing zones

Account structure, networking and guardrails that keep the estate governable at scale.

Cost of migration

Parallel-run costs, egress, tooling and the FinOps practices that contain them.

Frequently asked questions

What are the 7 Rs of cloud migration?

Rehost (lift and shift), replatform (light optimisation), repurchase (move to a SaaS product), refactor (re-architect), retire (decommission), retain (keep as-is for now) and relocate (move the hypervisor estate). Each answers a different question — the useful part is not the list, but the criteria you use to assign workloads to it.

How long does a typical cloud migration take?

For mid-sized estates, expect a mobilisation phase of 6–12 weeks before the first production wave, then a migration cadence your team can sustain — often 12–24 months for a full data centre exit. Programmes that skip mobilisation typically discover their landing zone problems during wave one, which is the most expensive time to find them.

Should we migrate everything to the cloud?

Usually not. Workloads with hard latency constraints, long remaining hardware life, or strict data locality may be better retained — at least initially. A credible migration plan names what stays behind and why; it makes the business case more convincing, not less.

Keep exploring

Related topic areas

Cloud Platforms

Independent coverage of AWS, Microsoft Azure and Google Cloud — service depth, pricing models, enterprise fit, and how to choose.

2 resourcesExplore

Cloud Security & Compliance

Shared responsibility, identity-first security, posture management, encryption, and compliance mapping that auditors accept.

1 resourceExplore

Cost Optimization (FinOps)

FinOps practice, rightsizing, commitments and discounts, tagging, showback and the unit economics that make cost visible.

2 resourcesExplore

Practical next step

Making a cloud migration & strategy decision this quarter?

Our guides are written to be used, not just read — grab the frameworks, adapt the checklists, and get in touch if you need a sounding board.